Construction of an outdoor sports pool and a utility building in CsongrádConstruction of an outdoor sports pool and a utility building in Csongrád
Constructor: Csongrád Városi Vízilabda Sportegyesület
Client: Csongrád Városi Vízilabda Sportegyesület
Contractor: Homlok Zrt.
Project start date: 20 October 2021
Project end date: June 2022
Short description of the project:
According to the service contract concluded in October 2021, Homlok Zrt. is responsible for the implementation of the project involving the “Construction of an outdoor sports pool and a utility building” and for the performance of the works specified in the contract.
The following development work is carried out as part of the project:
- Construction of a 32x20x2.1 m swimming pool in accordance with FINA regulations, together with the required swimming pool engineering works.
- Stone surface paving around the pool (810 m2)
- Construction of a utility building.
- Replacement and re-routing of existing utilities.
- Construction of the power supply network of the building, spatial lighting around the pool, lightning protection and the IT network.
- Landscaping of the surrounding area and creation of green areas
The performance period for the task is 180 days after the handover of the work site.